Writing a BIM Execution Plan That Gets Used

A BIM execution plan document open beside a project model with roles and milestones highlighted

A BIM execution plan that sits unread in a folder doesn't help anyone. A useful one gets opened every week.

A BIM execution plan, often shortened to BEP, sets out how a project team will produce, share and manage information. It's referenced in ISO 19650 and in many client BIM requirements. A good BEP is a practical guide for the team. A poor one is a long document that nobody follows.

Pre-appointment and post-appointment

Under ISO 19650, a pre-appointment BEP is submitted with a tender to show how the team would meet the client's requirements. After appointment, a more detailed delivery BEP is developed. Other frameworks may use a single plan, but the idea is similar.

What a BEP usually contains

  • Project information and goals for BIM
  • Roles and responsibilities, including information managers
  • Standards, methods and procedures
  • The model breakdown, showing which models each party produces
  • Software and versions
  • Coordinates, units and level setup
  • File naming and folder structure
  • Common data environment and workflows
  • Level of information need at each stage
  • Model exchange schedule and formats
  • Coordination and clash detection procedures
  • Quality checks
  • Handover requirements

Respond to the client's requirements

The BEP should respond directly to the client's exchange information requirements or BIM requirements. A simple matrix linking each requirement to how it's met helps reviewers and the team.

Keep it practical

  • Use tables and diagrams instead of long text
  • Avoid copying generic content that doesn't apply
  • Include actual names, dates and file locations
  • Keep appendices for detailed procedures

Model breakdown

Define which models exist, who owns them and how they're divided, such as by building, zone or discipline. Clarity here prevents duplicated modelling and gaps.

Exchange schedule

Agree when models are shared, in what format and with what checks. Regular exchanges keep coordination steady.

Responsibility matrix

A responsibility matrix shows which party models which elements at each stage. It's one of the most useful parts of a BEP, because it settles common questions early.

Update it

A BEP isn't a one-off document. Update it when the team changes, when software versions change or when procedures are adjusted. Record versions so everyone uses the current one.

Share it with the whole team

Start with a template

Many organisations publish BEP templates, and the UK BIM Framework provides guidance aligned with ISO 19650. Starting from a recognised template helps make sure nothing important is missed, but always tailor it to the project. A BEP full of generic text gives the impression of compliance without helping the team.

A BEP that's short, specific and kept up to date becomes the team's shared rulebook, making coordination smoother and handover far easier.