Coordinating Consultants During Construction Documents

Overlapping architectural, structural and MEP drawing layers aligned on a shared grid

Your drawings might be spotless, but if the structural and MEP sets don't agree with them, the contractor only sees one thing: conflict.

In most projects, the Architect leads coordination of the design team. During construction documents, that role becomes intense, because every discipline is adding detail at the same time. Without a structured process, drawings drift apart and conflicts appear on site.

Set up a regular exchange

Agree a schedule for sharing models or backgrounds, such as weekly or fortnightly. Each exchange should include:

  • The current model or drawings
  • A short note of significant changes
  • The revision or date reference

Consistent exchanges are better than large, irregular ones, because changes stay manageable.

Use shared coordinates and standards

Make sure everyone uses the same grids, levels and coordinate system. A short BIM execution plan or CAD protocol sets out file naming, units, coordinates and exchange formats. On ISO 19650 projects, the information requirements and execution plan define much of this.

Keep an issue log

  • A description and location
  • Images or markups
  • Who is responsible
  • A target date
  • Status

Review the log at each coordination meeting. A shared log prevents issues from being forgotten between meetings.

Typical coordination topics

  • Structural grids, columns and slab edges
  • Beam depths and ceiling zones
  • Riser and shaft sizes
  • Plant room layouts and access
  • Penetrations through rated walls and floors
  • Drainage falls and floor finishes
  • Facade support and interfaces

Hold coordination reviews

At key milestones, overlay the disciplines in plan and section and review them together. Federated models make this easier, but a careful 2D overlay still catches a lot. Clash detection can help on more complex projects.

Coordinate drawing references

Make sure Architectural drawings reference consultant drawings correctly, and that consultants reference the current Architectural backgrounds. Outdated references are a common cause of RFIs.

Agree who resolves what

When conflicts arise, decide quickly who changes their design. A clear decision record, linked to the issue log, prevents the same problem being reopened later.

Final coordination check

Before issue, do a final cross-discipline review. Check that the latest consultant drawings are included, that sheet lists match and that notes don't conflict.

Keep meetings short and focused

Coordination meetings work best with a clear agenda built from the issue log. Review open items by priority, agree actions and owners, and move detailed technical discussions into smaller sessions with only the people involved. Circulate short notes promptly, so decisions are recorded while they're fresh and everyone knows what to change before the next exchange.

Strong coordination during CDs doesn't eliminate site issues, but it dramatically reduces them, and it shows clients and contractors a well-run design team.

If your team needs extra production capacity for work like this, take a look at our Architectural production services, or tell us about your project.