Plant Room Planning for Architects

A plant room plan with air handling units, pumps, boilers and maintenance clearance zones

Plant rooms are easy to squeeze early in design and very hard to enlarge later.

Plant rooms house the equipment that serves the building, such as boilers, chillers, air handling units, pumps, water tanks and electrical switchgear. They're often underestimated in early design, leading to cramped rooms or late changes. Planning them early helps the whole building work.

Early sizing

MEP engineers can provide early estimates of plant space based on the building's size and systems. Ask for them at concept stage. Allowing generous space early is easier than finding more later.

Location

Plant location affects:

  • Distribution routes to the building
  • Riser positions
  • Noise and vibration
  • Structural loads
  • Access for installation and replacement
  • External air intake and exhaust

Common locations include basements, roofs and dedicated plant floors.

Access for installation and replacement

Large equipment must be brought in during construction and may need replacing later. Consider:

  • Routes and door sizes
  • Lifting points or hatches
  • Roof access for cranes
  • Removable panels

Maintenance clearances

Equipment needs space around it for maintenance, such as removing filters, coils or tubes. Manufacturers and engineers can advise on clearances.

Ventilation

Some plant rooms need ventilation for combustion air or to remove heat. External louvres affect elevations, so coordinate them early.

Acoustics

Plant can be noisy. Consider:

  • Distance from sensitive spaces
  • Acoustic separation
  • Vibration isolation
  • Louvre attenuation

An acoustic consultant can advise on requirements.

Fire and safety

Drainage and floors

Plant rooms often need floor drains, bunds or waterproofing. Coordinate falls and drainage early.

Structural loads

Equipment can be heavy, especially water tanks and chillers. Share loads with the structural engineer.

Roof plant

Roof plant affects building height, appearance and structure. Screening may be needed for planning reasons.

Electrical rooms

Electrical rooms, such as substations and switch rooms, may have utility provider requirements for access, size and location.

Review regularly

Plant requirements change as design develops. Review plant spaces at each stage.

Plan for future equipment

Equipment is replaced several times over a building's life. Space and routes that allow replacement without major building work save significant disruption later. Discuss with the client and engineer how long equipment is expected to last and how it'll be replaced.

Coordinate with landscaping

External plant, such as generators, condensers or tanks, affects landscape and site design. Screening, access and noise need coordinating.

Well-planned plant rooms make buildings easier to build and maintain, and avoid costly redesigns late in the project.