Facade and Curtain Wall Details: The Architect's Role

On most curtain wall projects, the specialist designs the system. The Architect still owns the performance intent and the interfaces.
Curtain walls and complex facades are usually designed in detail by specialist contractors, based on the Architect's design intent. Getting the balance right, enough information to define the design but not so much that it conflicts with the specialist's system, is key.
Design intent drawings
The Architect typically produces:
- Elevations showing panel layouts, mullion grids and materials
- Plans and sections showing facade zones and setting out
- Typical details showing intent at key junctions
- Interface details with adjacent construction
- A performance specification
These define what the facade should look like and how it should perform, without fixing every component.
Performance requirements
Performance specifications commonly cover:
- Structural performance, such as wind loads, usually coordinated with the structural engineer
- Weather tightness, including air and water
- Thermal performance
- Acoustic performance
- Fire performance
- Movement accommodation
The specialist then designs a system to meet them and submits shop drawings and calculations.
Interfaces
The most important Architect drawings are often interfaces, where the facade meets:
- Slab edges and structure
- Roofs and parapets
- Ground level and thresholds
- Other facade systems
- Internal finishes
Show who's responsible for each element at each interface.
Fire at slab edges
Fire stopping between the facade and slab edge is critical. Requirements depend on the code and building type. In England, Approved Document B sets requirements, including restrictions on combustible materials in external walls of certain buildings. In the US, the IBC addresses exterior wall fire performance and perimeter fire barriers. In the UAE, the Fire and Life Safety Code sets facade requirements. Confirm requirements with the fire engineer.
Movement
Facades need to accommodate building movement, such as slab deflection and thermal expansion. The structural engineer usually provides movement values, which the facade specialist designs for.
Reviewing specialist drawings
Coordinate early
Early engagement with facade specialists, where procurement allows, helps resolve technical issues before the design is fixed.
Plan for maintenance and access
Facades need cleaning and maintenance over the building's life. Consider how glazing will be cleaned and replaced, whether building maintenance units or access systems are needed, and how these affect the facade design. Showing these provisions early avoids late changes to roof layouts and facade fixings.
- 01Design intent drawings
- 02Performance requirements
- 03Interfaces
- 04Fire at slab edges
- 05Movement
- 06Reviewing specialist drawings
Mock-ups and testing
Larger facade packages often include visual mock-ups and performance testing. Allow for them in the specification and programme.
Good facade documentation defines what matters and leaves room for specialist expertise, giving the building an envelope that looks right and performs well.
| Region | What this guide notes |
|---|---|
| US | In the US, the IBC addresses exterior wall fire performance and perimeter fire barriers. |
| UK | In England, Approved Document B sets requirements, including restrictions on combustible materials in external walls of certain buildings. |
| UAE | In the UAE, the Fire and Life Safety Code sets facade requirements. |
If your team needs extra production capacity for work like this, take a look at our Architectural production services, or tell us about your project.
Related articles

Wall Sections Explained: What to Show and Why
The drawing that ties plans, elevations and details together.
Read more →
Documenting Fire-Rated Walls, Floors and Penetrations
Tested assemblies, wall types, fire stopping and doors documented consistently.
Read more →
MEP Shop Drawings: What Architects Should Check
How shop drawings differ from design drawings, and what to look for in review.
Read more →