US Building Permit Set Checklist for Architects

A clipboard checklist with ticked items next to a stack of permit drawings

A missing sheet or an unsigned page can send a permit set straight back. A checklist catches that before it's submitted.

Permit reviewers see many submissions, and incomplete sets are often returned before detailed review starts. A checklist helps make sure the set is complete and consistent before it goes in. Always use the local jurisdiction's checklist alongside your own.

Administrative items

  • Completed application forms
  • Project address, parcel number and owner information
  • Licensed professional stamps and signatures where required
  • Scope of work description
  • Deferred submittals listed
  • Special inspections statement where required

Cover sheet and general information

  • Drawing index
  • Applicable codes and editions
  • Project data, such as occupancy, construction type and areas
  • Vicinity map
  • Abbreviations, symbols and general notes

Code analysis

  • Occupancy classification and mixed-use approach
  • Construction type
  • Allowable height and area calculations
  • Fire resistance ratings
  • Fire protection systems
  • Occupant loads, exits and egress widths
  • Plumbing fixture calculations

Life safety plans

  • Exit routes and travel distances
  • Rated walls and doors
  • Occupant loads by area
  • Fire extinguisher and alarm locations if required

Architectural drawings

  • Site plan with setbacks, access and accessible routes
  • Floor plans, roof plans and RCPs
  • Elevations and sections
  • Wall sections and key details
  • Door and window schedules
  • Enlarged accessible toilet plans

Accessibility

  • Accessible routes and entrances
  • Parking and signage
  • Toilet rooms and fixtures
  • Clearances and mounting heights

Energy compliance

  • Envelope information
  • Compliance documentation, such as COMcheck or REScheck reports
  • Lighting and mechanical compliance, often by engineers

Coordination

  • Structural, MEP and civil drawings included as required
  • Consistent sheet references
  • Matching information across disciplines

Final checks

  • All sheets stamped and dated as required
  • Sheet count matches index
  • File naming and format meet the portal's requirements
  • Any electronic submission rules followed, such as file size limits and flattened PDFs

After submission

Track the review status and respond promptly to comments.

Tailor the checklist

Every jurisdiction has its own requirements, and building types bring their own concerns. Start from a standard office checklist, then add the jurisdiction's checklist items and any project-specific requirements, such as healthcare or high-rise provisions.

Assign responsibility

Give each checklist section an owner, such as the project Architect for code analysis or the MEP engineer for energy compliance. Clear responsibility makes sure nothing falls between disciplines.

Use past comments

Review comments from earlier submissions to the same jurisdiction. They often reveal local priorities that a general checklist won't capture, and adding them to the checklist helps future projects.

Keep it updated

Update the checklist when codes, portals or local requirements change.