Builder's Work in Connection With Services

A wall with service openings, a concrete plinth for equipment and fire-stopped penetrations

Every pipe and duct that passes through a wall or slab needs a hole. Builder's work makes sure it's planned, not improvised.

Builder's work in connection with services, often shortened to BWIC, covers the building work needed to accommodate MEP installations. It's a common term in the UK and is used in other regions too. Elsewhere, similar work may be described differently, but the coordination need is the same.

Typical BWIC items

  • Openings in walls and floors for services
  • Sleeves through walls, floors and roofs
  • Plinths and bases for equipment
  • Access panels and hatches
  • Builder's work ducts and trenches
  • Lintels over openings
  • Fire stopping around penetrations, though responsibility varies
  • Making good after installation

Why it matters

If builder's work isn't coordinated, services may arrive on site with no openings, plinths or supports ready. This causes delays, cutting of finished work and sometimes damage to structure or fire separation.

Who provides information

MEP engineers or subcontractors usually provide BWIC information, such as opening sizes, locations and loads. The Architect and structural engineer then incorporate it into their drawings.

BWIC drawings

BWIC information is often shown on:

  • Dedicated builder's work drawings
  • Architectural plans and sections
  • Structural drawings for slab and wall openings
  • Schedules of openings

Structural openings

Openings in structural elements need coordination with the structural engineer. Large openings, or those near columns and beams, may need structural design changes.

Fire-rated elements

Openings through fire-rated walls and floors need protection, such as fire-stopping, collars or dampers. Make sure the approach is clear and responsibilities are agreed.

Timing

BWIC information should be coordinated before relevant elements are built. For example, slab openings need to be known before concrete is poured. Late information leads to coring and cutting.

Responsibility

Contracts should make clear who provides each BWIC item, whether the main contractor, MEP subcontractor or another party. Ambiguity causes gaps.

Coordination in BIM

In BIM projects, MEP models can help identify where openings are needed. Some workflows place opening elements in models for coordination.

Check on site

Schedule openings

A schedule listing each opening with its location, size, fire rating and responsible party helps track builder's work through design and construction. It's especially useful on large projects with many penetrations.

Review at key stages

Review BWIC information before structural design is finalised, before slabs are poured and before walls are closed. These are the points where missing items are cheapest to fix.

Coordinated builder's work helps services install smoothly and protects the building's structure and fire separation.