[SPEC: ARCHITECTURAL PRODUCTION & BIM]
LIBRARY // ACCURATE MODELLING AND RESEARCH

Measured Building Surveys Explained

A surveyor with a total station and laser scanner inside an existing building

Before you can redesign a building, you need to know exactly what's there. That's the job of a measured survey.

Work on existing buildings starts with knowing what's there. A measured building survey records the geometry of a building, such as walls, openings, levels and roofs, so design can begin from accurate information. The quality of the survey affects everything that follows.

Survey methods

  • Hand measurement: tape and laser distance meters, suitable for small, simple spaces
  • Total station: precise measurement of points, often used to set up control and for elevations
  • Laser scanning: captures millions of points quickly, creating a point cloud
  • Photogrammetry: creates 3D data from overlapping photographs

Many surveys combine methods, such as total station control with laser scanning.

Typical deliverables

  • Floor plans
  • Sections
  • Elevations
  • Roof plans
  • Reflected ceiling plans
  • Point clouds
  • 3D models

Deliverables can be 2D CAD drawings, BIM models or both.

Specifying a survey

A clear specification helps get what you need. Consider:

  • Areas to be surveyed
  • Deliverables and formats
  • Level of detail and accuracy
  • Coordinate system and levels datum
  • Features to include, such as services, finishes or structural elements
  • Access arrangements

Guidance from professional bodies, such as the RICS guidance on measured surveys in the UK, and specifications such as the USIBD Level of Accuracy in the US, can help define requirements.

Accuracy

Survey accuracy depends on methods, equipment and conditions. Specify accuracy appropriate to the project. High accuracy costs more time, so match it to need.

Control and coordinates

A survey control network ties measurements together and to site coordinates. Agree the coordinate system and level datum so surveys align with other site information.

Hidden elements

Surveys record visible surfaces. Hidden elements, such as structure inside walls or services in ceilings, may need intrusive investigation or other specialist surveys.

Checking surveys

  • Do dimensions match site checks?
  • Are all areas included?
  • Is the drawing layered and organised as specified?
  • Do plans, sections and elevations agree?

Survey limitations

Surveys reflect the building at the time of survey. Note any areas that weren't accessible, and plan follow-up surveys if needed.

Using surveys in design

Base drawings or models on the survey, not on old drawings. Old drawings may not match the building as built.

Briefing the surveyor

A clear survey brief states the areas to cover, the drawings and model outputs needed, the level of detail and the required accuracy. It avoids paying for detail nobody needs, or missing detail that matters later.

A good measured survey gives existing building projects a reliable starting point and reduces surprises during construction.

If your team needs extra production capacity for work like this, take a look at our Architectural production services, or tell us about your project.

Related articles